"TURBO" PROJECT (Increase production capacity)

Project Description

Turbo Project (2013): Major expansion of the plant (nearly 80,000 sq.ft.) to house production areas, refrigerated storage, reception and storage of milk as well as wastewater treatment.

The Berwil team took care of installing all the various production equipment and connecting the ancillary services.

Project Challenges

  • Work carried out in “Fast-Track” mode;
  • Carrying out all the work while ensuring the maintenance of the operations of the entire plant;
  • Coordination with the various building modifications;
  • Modification and connection of auxiliary services.
Return to Projects
  • Area 80,000 sq.ft
  • Contractual Formula On time and material