Kraft – Heinz Canada

"FOOTPRINT" PROJECT (2 sub-projects)

Project Description

Sub-project 1: Installation at the Town of Mount Royal plant of 8 production and packaging lines from 2 other Kraft plants (2 from Ste-Mary, Ontario and 6 from Lee High in Pennsylvania). The work mandate included: Disconnection, transport, reassembly / installation and connection. The project also included increasing the capacity of certain ancillary services (chilled water and ammonia system).

Sub-project 2: Fitting-out of premises as well as the dismantling and installation of two new Tassimo coffee packaging line

Project Challenges

  • Carrying out all the work while ensuring the maintenance of the operations of the entire plant;
  • Coordination with the various building modification works;
  • Modification and connection of auxiliary services.

Return to Projects
  • Area 76,000 sq.ft
  • Contractual Formula On time and material